Honda Civic/Acura Integra

from 1994 launch

Repair and operation of the car



Honda Tsivik
+ Cars of the mark of It Treats Full text and Honda Civic With care
+ Maintenance education
+ Regular maintenance
+ Motor
+ To cool system and heating
- System of provision of power and launch
   Specifications
   To leave pressure in a power supplies to the system
   Check of usefulness of functioning of the bomb / pressure of fuel of fuel
   Check of a state and substitution of lines of fuel and his connections of nipple
   Removal and installation of the bomb of fuel
   Check of a state and substitution of the sensor of consumption of fuel
   Removal and installation of the tank of fuel
   To clean and repair of the tank of fuel - general information
   Removal and installation of meeting of the purifier of air
   Removal, installation and agreement of a thread of a gas pedal
   System of electronic injection of fuel (EFI) - the general information
   Check of usefulness of functioning of system of injection
   Removal and installation of the case of a regulator
   Removal and installation of the regulator of pressure of fuel
   Removal and installation of the road of fuel and injectors of fuel of injectors of fuel
   Launch system - the general information
+ Electric motor equipment
+ Systems of control of the motor
+ Box of dislocation of gear
+ Union and ends of power
+ Brakes system
+ Support of the triangular form of interruption and direction
+ Body
+ Electric side equipment


5dfc58ab

Removal and installation of the case of a regulator

Before beginning artistic proceedings they hope for the cooling full of the motor!


 ORDER OF REALIZATION

1. Desconecte a negative wire of the battery.

If the stereosystem established in the car if it equips of a security code before desconectar the battery they secure what has the correct combination of the introduction of the equipment to the action!


2. Withdraw the air sleeve that joins the purifier of air to the case of regulator.
3. Desconecte an electrical system of sensors of the provision of a valve of butterfly (TPS) and absolute pressure in the oil pipeline (MARCH) in case of regulator. Mark and desconecte hoses of vacuum of the case of regulator.
4. Desconecte of the lever of a valve of butterfly a gas thread (to see the Removal, the installation and the agreement of a thread of a gas pedal) and a thread of the walk of a valve of butterfly in the kick way is lowered by me (I model with in – organized 4 see automatic exchanges and stepless (ат and CVT)).
5. Desconecte hoses of a way that cools of the case of regulator. At the same time to a zakuporta the open hoses ends for aims of the reduction to the losses minimum of cooling the liquid.

6th. The fixation of case of regulator of launch (4 nuts [the models of Full text of 1994 of the question], or two nuts and two pins [other models]) (companions see illustrations). Separate the case of regulator of the oil pipeline of entry and withdraw the placing of fighter. Carefully scratch out aspects of the old placing of the inter-connected surfaces of the case of a regulator and the camera of delivery of an air road.

6b. Fixation of the case of a regulator of a drawing of niskhodyashche-line.

7. The installation is done upside-down. Do not forget of substituting the placing of fighter. Hold tight the fixation of the case of a regulator with the necessary effort. In the conclusion they do threads of gas pedal of agreement (to see the Removal, the installation and the agreement of a thread of a gas pedal) and the walk of a valve of butterfly in the kick way is lowered by me (organized 4 see automatic exchanges and stepless (ат and CVT)). Check that the level of cooling the liquid, in case of the necessity they do the corresponding agreement.