Honda Civic/Acura Integra

from 1994 launch

Repair and operation of the car



Honda Tsivik
+ Cars of the mark of It Treats Full text and Honda Civic With care
+ Maintenance education
+ Regular maintenance
+ Motor
+ Cooling of system and heating
+ System of provision of power and launch
+ Electric motor equipment
+ Systems of control of the motor
- Box of dislocation of gear
   + Manual box organized 5 of dislocation of gear
   - Automatic exchanges organized 4 and stepless (ат and CVT)
      General information
      Diagnostic of failure of em/CVT - the general information
      Check and adjust of a thread of management of a valve of butterfly in the kick way I lower (thread of TV) - the models of Full text
      Substitution and agreement of a thread of dislocation of gear
      Agreement and substitution of the switch of sensor of position of the lever of the selector of transfers
      System of blockade - the general information, check of a state, substitution and agreement of an eletroímã of management
      Check and substitution of valves eletromagnéticas of blockade management
      Removal and installation of automatic exchanges organized 4 and stepless (in and CVT)
+ Union and ends of power
+ Brakes system
+ Support of the triangular form of interruption and direction
+ Body
+ Electric side equipment


5dfc58ab

Check and substitution of valves eletromagnéticas of blockade management

To check

Valve eletromagnética of blockade management

 ORDER OF REALIZATION

1. Disunite to electric capture of the meeting of the valve eletromagnética of the management of blockading (companion to see an illustration).

2. Measure resistance between each one of captures of capture (of the valve) and I weigh. Compare when they resulted from measurements to Specifications demands. In case of the necessity they substitute the meeting of the valve.
3. In sole series each one of captures from capture to a positive pole of the battery, – distintamente he heard the click that the operation companion of each one of valves will sound. If the click is not heard, it is necessary to expel the car in the workshop of repairs of the car to execute diagnostic full-scale of ESM and outlines of valves eletromagnéticas.

Valve eletromagnética of management of blockade of dislocation of gear

 ORDER OF REALIZATION

1. Disunite to electric capture of the valve eletromagnética of the management of blockade of dislocation of gear (companion sees an illustration).

2. Measure resistance between each one of captures of capture (of the valve) and I weigh. Compare when they resulted from measurements to Specifications demands. In case of the necessity they substitute the meeting of the valve.
3. In sole series each one of captures from capture to a positive pole of the battery, – distintamente he heard the click that the operation companion of each one of valves will sound. If the click is not heard, it is necessary to expel the car in the workshop of repairs of the car to execute diagnostic full-scale of ESM and outlines of valves eletromagnéticas.
4. In sole series each one of captures from capture to a positive pole of the battery, – distintamente he heard the click that the operation companion of each one of valves will sound. If the click is not heard, it is necessary to expel the car in the workshop of repairs of the car to execute diagnostic full-scale of ESM and outlines of valves eletromagnéticas.

Substitution

It is not possible to do the substitution of only one of valves eletromagnéticas in an individual order. The whole meeting valvate (the valve of the management of blockade and the valve of the management of blockade of dislocation of gear) is subject to the substitution.


 ORDER OF REALIZATION

1. Give pins of fixation and withdraw the meeting valvate (companion sees an illustration).

2. Carefully rub the inter-connected surfaces and clean maslotok.
3. Substitute the placing of fighter and establish the new meeting valvate at the regular place. Hold tight pins of fixation with the necessary effort.
4. Check that the electric capture of the existence of signs of pollution and oxidation, in case of the clean necessity and again one adheres.
5. Check the usefulness of the functioning of valves eletromagnéticas of the management (to see in top).