Honda Civic/Acura Integra

from 1994 launch

Repair and operation of the car



Honda Tsivik
+ Cars of the mark of It Treats Full text and Honda Civic With care
+ Maintenance education
+ Regular maintenance
+ Motor
- To cool system and heating
   Specifications
   Antifreeze - general information
   Check of usefulness of functioning and substitution of the thermostat
   Check of a condition of the supporter (supporters) of the system of cooling and chain of his inclusion, substitution of the supporter (supporters)
   Removal and installation of an electric heater and wide tank of the system of cooling
   Removal and installation of the fridge of oil
   Check of a condition of the water bomb
   Substitution of the water bomb
   The check of usefulness of the functioning and substitution of the block of the sensor of the instrument of measuring of the temperature of cooling the liquid
   Check of usefulness of functioning of an electric motor of driving of the supporter of a heater and condition of component ones of his electric chain, substitution of component ones
   Removal and installation of an electric motor of the walk of the supporter of a heater
   Removal and installation of meeting of the panel of control of functioning of a heater and condicionador of air, agreement of a thread of driving
   Substitution of the conductor of heat of a heater
   Check of usefulness of functioning and service of systems of heating and air conditioning
   Check of an electric chain of an union of pressure of the compressor K/V
   Removal and installation of a desumidificador of receiver to / in
   Removal and installation of the compressor K/V
   Removal and installation of the condenser K/V
   Removal and installation of evaporador K/V with the wide valve
+ System of provision of power and launch
+ Electric motor equipment
+ Systems of control of the motor
+ Box of dislocation of gear
+ Union and ends of power
+ Brakes system
+ Support of the triangular form of interruption and direction
+ Body
+ Electric side equipment


5dfc58ab

Substitution of the water bomb

The implementation of the proceeding begins only after the cooling full of the motor!


 ORDER OF REALIZATION

1. Desconecte a negative wire of the battery.

If the stereosystem established in the car if it equips of a security code before desconectar the battery they secure what has the correct combination of the entry of the system sound in the action!


2. Empty the system of cooling (to see the Front Regular maintenance). If the substitution of cooling the liquid was done quite recently, guard it for the new use.
3. Take away belts of the walk of auxiliary unities (to see the Front Regular maintenance).
4. Take away a belt that distributes the gas (to see the Repair of Part of the motor without extraction of the car - the Civic model). In Full text the models withdraw pulleys of axles, and also a rear policeman of the motor.
5. Withdraw arms of the fixation of auxiliary accessories of the water bomb.

6. Result pins of fixation (companion sees an illustration) and separate the bomb of the motor. Try to be remembered the position of a long pin.

7. Clean a woodcarving of fixing pins and the openings shot in the block, having exempted it completely of corrosion aspects, in case of the necessity they restore the incomplete groups.
8. One secures of the complaisance of the new old bomb in a so great standard.
9. Withdraw all the aspects of the selante and the material of an old ring of fighter of the inter-connected surface of the block of the motor.
10. Rub the inter-connected surfaces of the motor and the new bomb with the rags moistened in the acetone.

11. Polish a bottom and the walls of the flute under the installation of a ring of fighter in case of the new bomb with the selante RTV, then exactly enclose in a flute a new ring of fighter (companion sees an illustration).

12. Carefully hold tight the bomb to the block of motor, screw the couple of fixing pins and hold tight them, for the time being only to the hand.
13. Screw the remained pins (if some of them also is in use to fix of auxiliary arms, do not forget of establishing also the last thing). In stages, – in
The turns of 1/4 of the approximation, – they hold tight the fixation with the necessary effort.

The pins tug is not inadmissible in view of the risk of the deformation the inter-connected surfaces anyway!


14. Install all the component ones that were withdrawn for aims of securing the access to the bomb.
15. Fill the system of cooling and withdraw of him traffic jams of air traffic, check the effort of a tension of a belt (he) of the walk of auxiliary unities (to see the Front Regular maintenance). The motor begins and it is checked by the existence of signs of the hole of cooling the liquid.