1. Desconecte a negative wire of the battery.
|
If the stereosystem established in the car if it equips of a security code before desconectar the battery they secure what has the correct combination of the entry of the system sound in the action! |
2. Empty the system of cooling (to see the Front Regular maintenance). If the substitution of cooling the liquid was done quite recently, guard it for the new use. 3. Take away belts of the walk of auxiliary unities (to see the Front Regular maintenance). 4. Take away a belt that distributes the gas (to see the Repair of Part of the motor without extraction of the car - the Civic model). In Full text the models withdraw pulleys of axles, and also a rear policeman of the motor. 5. Withdraw arms of the fixation of auxiliary accessories of the water bomb.
|
6. Result pins of fixation (companion sees an illustration) and separate the bomb of the motor. Try to be remembered the position of a long pin. |
7. Clean a woodcarving of fixing pins and the openings shot in the block, having exempted it completely of corrosion aspects, in case of the necessity they restore the incomplete groups. 8. One secures of the complaisance of the new old bomb in a so great standard. 9. Withdraw all the aspects of the selante and the material of an old ring of fighter of the inter-connected surface of the block of the motor. 10. Rub the inter-connected surfaces of the motor and the new bomb with the rags moistened in the acetone.
|
11. Polish a bottom and the walls of the flute under the installation of a ring of fighter in case of the new bomb with the selante RTV, then exactly enclose in a flute a new ring of fighter (companion sees an illustration). |
12. Carefully hold tight the bomb to the block of motor, screw the couple of fixing pins and hold tight them, for the time being only to the hand. 13. Screw the remained pins (if some of them also is in use to fix of auxiliary arms, do not forget of establishing also the last thing). In stages, – in The turns of 1/4 of the approximation, – they hold tight the fixation with the necessary effort.
|
The pins tug is not inadmissible in view of the risk of the deformation the inter-connected surfaces anyway! |
14. Install all the component ones that were withdrawn for aims of securing the access to the bomb. 15. Fill the system of cooling and withdraw of him traffic jams of air traffic, check the effort of a tension of a belt (he) of the walk of auxiliary unities (to see the Front Regular maintenance). The motor begins and it is checked by the existence of signs of the hole of cooling the liquid. |
|