Honda Civic/Acura Integra

from 1994 launch

Repair and operation of the car



Honda Tsivik
+ Cars of the mark of It Treats Full text and Honda Civic With care
+ Maintenance education
+ Regular maintenance
- Motor
   - Repair of the motor without extraction of the car - the Civic model
      General information
      The preparatory actions and the list of proceedings of repair that can happen without the extraction of the motor of the car
      Reduction of the piston of the first cylinder in the provision of the superior dead point (TDP)
      Removal and installation of a covering of a head of cylinders
      Removal and installation of the oil pipeline of entry
      Removal and installation of a final collector
      The systems VTEC - the general information and check of a condition of component ones
      Removal, check of a state and installation of meeting of yokes
      Spring substitution valvate with plates and hats maslootrazhatelny
      Removal, check of a state and installation of a belt that distributes the gas and cog-wheels of GRM drive
      Substitution of an advanced epiploon of an end of inclination
      Removal, check of a state and installation of the axle
      Removal and installation of a head of cylinders
      Removal and installation of the trundle bed of a case of the motor
      Removal, check of a state and installation of the bomb of oil
      Removal and installation of a pendulum / driving of disc
      Substitution of a few back epiploon of an inclination end
      Check of a state and substitution of support of a support of the triangular form of interruption of the unity of power
   + Repair of the motor without extraction of the car - the Full text model
   + General and repairs of capital of the motor
+ Cooling of system and heating
+ System of provision of power and launch
+ Electric motor equipment
+ Systems of control of the motor
+ Box of dislocation of gear
+ Union and ends of power
+ Brakes system
+ Support of the triangular form of interruption and direction
+ Body
+ Electric side equipment


5dfc58ab

Removal, check of a state and installation of the bomb of oil

Removal

 ORDER OF REALIZATION

1. There takes away a belt of GRM drive (to see Removal, checks of a state and installation of a belt that distributes the gas and cog-wheels of GRM drive).
2. Withdraw the trundle bed of case of motor (to see the Removal and the installation of the trundle bed of a case of the motor).

3. Desconecte to meeting of a maslozabornik with a grill and a tube of the bridge of coverings of radical loads and an accommodation of bomb (companion sees an illustration).

4. Result fixation pins and withdraw the bomb of oil of the motor (companion sees an illustration).

5. Result fixation screws and discover with the bomb (companion sees an illustration).


Not to break an opening in leaders of fixation of screws it is better to do his relief through an impact driver.

To check

 ORDER OF REALIZATION

1st. Measure an axial slit of wheels of gear of the bomb (companions see illustrations).

1b. Measure a slit between tops of teeths of gear wheels.

1c. Measure a slit between a wheel of extern gear and the case. Compare when they resulted from measurements to Specifications demands. If the slits size exceeds admissible values, substitute the bomb.

2. There results a cork of the valve that it reduces and take of a nest in a bomb accommodation one spring and a diver of the valve. Check one spring to deformations existence and a diver – for the scratches existence and zadir. The component incorrect ones are subject to the substitution.
3. Establish wheels of gear in a bomb accommodation and fill cavities between the technical vaseline teeths.
4. Screws of fat of fixation of a covering of the bomb with the antiseizure selante. Establish a covering, screw screws and hold tight them with the necessary effort. Establish one spring and a diver of the valve that it reduces in a bomb accommodation. Having substituted a lavador of fighter, screw a cork and strongly hold tight it.

Installation

 ORDER OF REALIZATION

1. Lightly the fat with the selante anaeróbico to surface of an inter-connected accommodation of bomb to the block and the new fighter ring is enclosed in a flute in the case. Install the bomb in the block and with the necessary effort they hold tight pins of fixation.
2. Establish in the meeting of place of a maslozabornik, having held tight pins they fix with the necessary effort (do not forget of substituting the placing of fighter).
3. Install the trundle bed of case (to see the Removal and the installation of the trundle bed of a case of the motor).
4. The new installation is done as it must be, the return to an order to be demolished. In the conclusion they do not forget of filling out the oil of motor in the motor and filling the system of cooling (to see the Front Regular maintenance).
5. The motor begins and it is checked by the existence of signs of holes.