Honda Civic/Acura Integra

from 1994 launch

Repair and operation of the car



Honda Tsivik
+ Cars of the mark of It Treats Full text and Honda Civic With care
+ Maintenance education
+ Regular maintenance
- Motor
   - Repair of the motor without extraction of the car - the Civic model
      General information
      The preparatory actions and the list of proceedings of repair that can happen without the extraction of the motor of the car
      Reduction of the piston of the first cylinder in the provision of the superior dead point (TDP)
      Removal and installation of a covering of a head of cylinders
      Removal and installation of the oil pipeline of entry
      Removal and installation of a final collector
      The systems VTEC - the general information and check of a condition of component ones
      Removal, check of a state and installation of meeting of yokes
      Spring substitution valvate with plates and hats maslootrazhatelny
      Removal, check of a state and installation of a belt that distributes the gas and cog-wheels of GRM drive
      Substitution of an advanced epiploon of an end of inclination
      Removal, check of a state and installation of the axle
      Removal and installation of a head of cylinders
      Removal and installation of the trundle bed of a case of the motor
      Removal, check of a state and installation of the bomb of oil
      Removal and installation of a pendulum / driving of disc
      Substitution of a few back epiploon of an inclination end
      Check of a state and substitution of support of a support of the triangular form of interruption of the unity of power
   + Repair of the motor without extraction of the car - the Full text model
   + General and repairs of capital of the motor
+ Cooling of system and heating
+ System of provision of power and launch
+ Electric motor equipment
+ Systems of control of the motor
+ Box of dislocation of gear
+ Union and ends of power
+ Brakes system
+ Support of the triangular form of interruption and direction
+ Body
+ Electric side equipment


5dfc58ab

Removal, check of a state and installation of the axle

Check of a play of axial side and thrashing of side

 ORDER OF REALIZATION

1. The control of a play of axial side happens how if it follows:
   a) Install the axle in the motor and fix it for loads coverings;

   b) Fix the instrument of measuring of disc in a head of cylinders, when a diver rested it against a face of end of end (companion seeing an illustration);

   c) Having used the great screwdriver like the lever, take an end against the stopped one behind and cancel the instrument of measuring, soon push an end they dispatch and consider the reading instrument;
   d) Compare the result of the measurement to Specifications demands;
   e) O excessive size of a play of axial side talks about the use of the axle or head.
2. For check thrash from side:
   a) Put the retired axle of the motor in two prisms V-shaped, soon hold tight a diver of the instrument of measuring from disc to a neck of the central and so great load of thrashing of measure in the moment of the rotation of an end;
   b) Compare when they resulted from the measurement to Specifications demands;
   c) In the excessive struggle the axle is subject to the substitution.

Removal

 ORDER OF REALIZATION

1. Discover a head of cylinders (to see the Removal and the installation of a covering of a head of cylinders).
2. Bring the piston of the first cylinder in the provision of VMT (to see the Reduction of the piston of the first cylinder in the provision of the superior dead point (TDP)).
3. Remove the distributor of ignition (to see the Chief Elektrooborudovaniye of the motor).
4. In case of the necessity they turn a pin of the fixation of a cog-wheel of the axle for aims of the removal he from a pin.

For aims of blockading of an end of a provorachivaniye they pass the screwdriver through one of openings in a cog-wheel.


5. Withdraw the meeting of yokes (to see the Removal, the check of a state and the installation of the meeting of yokes). If the coverings of loads of the axle are subject to the removal of the meeting, they have to be marked like installation (etiquettes abolished asymmetrically of a guarantee of the correct direction of coverings).

6. Take an end of inclination (companion sees an illustration).

To check

 ORDER OF REALIZATION

1. Check groups of load of an end and internal surfaces of coverings of loads of the existence of scratches and zadir. In case of the detection of serious defects the head of cylinders is subject to the substitution in new or restored. Through the tipsy plastic wire (Plastigauge establishes) they measure the size of slits of work in loads. Compare when they resulted from measurements to Specifications demands.

The educations of the use of the play of Plastigauge are supplied in Installation of an end of inclination and check of slits of work of radical loads and Installation of conrod and meetings of piston and check of the size of slits of work in loads conrod of an end of inclination of the Part the General repairs and the repairs of capital of the motor of the present Chapter. If the slit of some of loads exceeds the limit of the admissible variety, substitute the axle.


2. Degree of estimate of use of cames of the axle:
   a) Attentively examine the surfaces they are formed of edges of work of all the cames, when the scratches existence is checking them, zadir and signs of the unequal use;
   b) In case of the detection of the defect of at least one of cames they substitute the axle. One does not forget of the necessity of the identification of causes of the use – oil of reason of check of the presence of particles abrasivas in him. Check passability of the bomb of oil and the whole maslotok (the use of the lifting of cames is joined very often with pollution of oil or violation of his offer);

   c) Through a height of measure of micrometer of cames (companion sees an illustration). Compare when they resulted from measurements, in case of the necessity they substitute the axle.

3. Check surfaces of work of yokes of the walk of valves of the existence of signs of use, atritos, cavities and other defects.
4. In case of the identification of some of the enumerated ones above defects it is necessary to check a condition of oil of reason and the usefulness of his offer in a head of cylinders. Only having established and having withdrawn a cause of the breach they begin the installation of replaceable component ones (a head, the axle or the yokes meeting).

Installation

 ORDER OF REALIZATION

1. Carefully compensate for the axle, the beds of his loads in a head of cylinders and coverings, and also yokes of the walk of valves. Try to withdraw completely the most light aspects of mud and dirt. To be scratched of component ones only they use purely, неворсящуюся rags.

2. The cames of fat and the necks of load of the axle with the lubricant of special meeting (companion sees an illustration).


If not carefully it polishes an end before the installation, it can lead to serious loads damages and cames in the first seconds after the launch of the motor before the normal circulation of oil.


3. Exactly lower the axle in a head of cylinders. Having used a head of face of the corresponding size or a part of a tube of the convenient diameter like a mandrel, post tore an epiploon to the regular place (the party confided in the spring established in a groove in the interior).
4. Establish in the meeting of place of yokes (to see the Removal, the check of a state and the installation of the meeting of yokes).
5. Having become an end like appropriated, they put his advanced pin a cog-wheel (marking of during 12 hours).
6. There install a belt of GRM drive and the component companions (to see Removal, check of a state and installation of a belt that distributes the gas and cog-wheels of GRM drive).

If in the course of the service of a head the provision of an end of inclination was lowered, take care during the installation of a belt of the alignment of adjusting etiquettes of his cog-wheel (to see Removal, checks of a state and installation of a belt that distributes the gas and cog-wheels of GRM drive).


7. Result when they were taken of spark and become an end of inclination manually, checking the fairness of the installation of phases of the distribution of gas. For two turns that adjust etiquettes of the gear they will return to an initial position. Otherwise take away a belt and carry out the necessary combination of etiquettes.

If in the course of a provorachivaniye of an end of inclination there is resistance, the proceeding must be stopped immediately!


8. The new installation is done as it must be, the return to an order of is demolished of component ones.