Honda Civic/Acura Integra

from 1994 launch

Repair and operation of the car



Honda Tsivik
+ Cars of the mark of It Treats Full text and Honda Civic With care
+ Maintenance education
+ Regular maintenance
- Motor
   + Repair of the motor without extraction of the car - the Civic model
   - Repair of the motor without extraction of the car - the Full text model
      General information
      The preparatory actions and the list of proceedings of repair that can happen without the extraction of the motor of the car
      Reduction of the piston of the first cylinder in the provision of the superior dead point (TDP)
      Removal and installation of a covering of a head of cylinders
      Removal and installation of the oil pipeline of entry
      Removal and installation of a final collector
      Removal, check of a state and installation of a belt that distributes the gas and cog-wheels of GRM drive
      Substitution of an advanced epiploon of an end of inclination
      The systems VTEC - the general information and check of a condition of component ones
      Removal, check of a state and installation of axles and meeting of yokes
      Spring substitution valvate with plates and hats maslootrazhatelny
      Removal and installation of a head of cylinders
      Removal and installation of the trundle bed of a case of the motor
      Removal, check of a state and installation of the bomb of oil
      Substitution of a pendulum / driving of disc
      Substitution of a few back epiploon of an inclination end
      Check of a state and substitution of support of a support of the triangular form of interruption of the unity of power
   + General and repairs of capital of the motor
+ Cooling of system and heating
+ System of provision of power and launch
+ Electric motor equipment
+ Systems of control of the motor
+ Box of dislocation of gear
+ Union and ends of power
+ Brakes system
+ Support of the triangular form of interruption and direction
+ Body
+ Electric side equipment


5dfc58ab

Removal and installation of a covering of a head of cylinders

Removal

 ORDER OF REALIZATION

1. Desconecte a negative wire of the battery.

If the stereosystem established in the car if it equips of a security code before desconectar the battery they secure what has the correct combination of the entry of the system sound in the action!


2. Discover with cylinders of heads of the distributor of ignition with the wires joined him by VV. Desconecte wires of the captures in a head of cylinders and his covering (to see the Front Regular maintenance). Do not forget of marking wires to avoid the violation of an order of the ignition in the meeting.
3. Mark and desconecte all the proceedings of a wire that obstructs the implementation and hoses of the case of a regulator and a covering of a head of cylinders.
4. Carefully rub a covering to avoid the blow of the garbage in a few front cylinders / meetings of the mechanism valvate.
5. To be results pins of the fixation of a covering of a head of cylinders – act as debit, the return specified in a picture (to see an illustration I lower).
6. Exactly discover together with the placing hunting. Putting of a podlipl for the inter-connected front surface, the hammer explores a covering with the gentle living creature for aims of the destruction of a layer of the selante. Do not do in the moment of all the attempts of there separates a covering for a poddevaniye his lever introduced between the inter-connected surfaces.

Installation

 ORDER OF REALIZATION

1. Separate the old placing, then carefully smooth the inter-connected surfaces of a head of cylinders and his covering. Having scratched it had been aspects of the old man selante and fragments of the placing, rub surfaces with the rags moistened in the acetone.
2. Check a condition of the captures of isolation for passage and selantes of rubber when they were established in candle niches. Substitute component incorrect. Before the installation of a covering they are secured available at the places of selantes of candles rubber.
3. A boy imposes selante RTV to corners where the inter-connected surface of a head is next to the yokes meeting. Wait approximately for five minutes, waiting for the time being from the beginning of the polymerism of the selante.

One secures that the superior layer of the selante lightly was hardened, only after him the installation of departure of a covering (in the conditions of the polymerism of increased moisture of the selante it can begin with a small delay).


4. Fill the new placing of form in the flute that goes to the perimeter of a covering and hold tight a covering to a head. Install the captures of isolation for the passage, screw nuts and hold tight them in that order (companion sees an illustration) with the necessary effort (to see Specifications).

4. The new installation is done as it must be, the return to a removal order.