Honda Civic/Acura Integra

from 1994 launch

Repair and operation of the car



Honda Tsivik
+ Cars of the mark of It Treats Full text and Honda Civic With care
+ Maintenance education
+ Regular maintenance
- Motor
   + Repair of the motor without extraction of the car - the Civic model
   - Repair of the motor without extraction of the car - the Full text model
      General information
      The preparatory actions and the list of proceedings of repair that can happen without the extraction of the motor of the car
      Reduction of the piston of the first cylinder in the provision of the superior dead point (TDP)
      Removal and installation of a covering of a head of cylinders
      Removal and installation of the oil pipeline of entry
      Removal and installation of a final collector
      Removal, check of a state and installation of a belt that distributes the gas and cog-wheels of GRM drive
      Substitution of an advanced epiploon of an end of inclination
      The systems VTEC - the general information and check of a condition of component ones
      Removal, check of a state and installation of axles and meeting of yokes
      Spring substitution valvate with plates and hats maslootrazhatelny
      Removal and installation of a head of cylinders
      Removal and installation of the trundle bed of a case of the motor
      Removal, check of a state and installation of the bomb of oil
      Substitution of a pendulum / driving of disc
      Substitution of a few back epiploon of an inclination end
      Check of a state and substitution of support of a support of the triangular form of interruption of the unity of power
   + General and repairs of capital of the motor
+ Cooling of system and heating
+ System of provision of power and launch
+ Electric motor equipment
+ Systems of control of the motor
+ Box of dislocation of gear
+ Union and ends of power
+ Brakes system
+ Support of the triangular form of interruption and direction
+ Body
+ Electric side equipment


5dfc58ab

Removal and installation of the oil pipeline of entry

It is worthwhile to remember that to gasoline it is the flammable liquid in the highest measure, – during the work with component of a system of provision of power they notice all the measures been overcome with the security of fire. Do not smoke and it does not bring near the place of works with the naked flame or the transport left unprotected by the shadow of lamp. It does not do the service of the system in the equipped quarter of the devices acalentadores using the natural gas and equipped of a torch of control (like vodogre and driers of the clothes). Do not forget of what to gasoline is between the substances cancerogenic what promote the development of the cancer – they try not to allow blows of the fuel in open parts of the body – they wear protective gloves of rubber, in the chance unforeseen contact carefully they wash out the hand quiet person with the soap. Immediately join the spilled fuel and do not put the rags impregnated by fuel and lubricants near to fountains of naked flame. remember that the system of provision of power of the equipped models of the injection of the fuel constantly is below the pressure. Before beginning a lack of interest of lines of fuel, deposit the residual pressure in the system (since more details see the Head of the system of provision of Power and launch). In the service of component ones of a provision of being able a system put wide eyes. Constantly one maintain near to on the hand the fire extinguisher of fire of the class B!

Removal

 ORDER OF REALIZATION

1. Desconecte a negative wire of the battery.

If the stereosystem established in the car if it equips of a security code before desconectar the battery they secure what has the correct combination of the entry of the system sound in the action!


2. Empty the system of cooling (to see the Front Regular maintenance).
3. Withdraw the purifier of air with an air entry (to see the Head of the system of provision of Power and launch).

In motors B18C1 the capture of the valve eletromagnética of a perepuskaniye of the soaked air is located below the oil pipeline in view of which access with him it contents itself extremely. An electrical system is possible alternatively desconectar after the removal of the partial separation of the oil pipeline of a head.


4. Having marked exactly, desconecte the whole electrical system that it obstructs is demolished of the entry oil pipeline and inhales lines (companion sees an illustration).

5. Desconecte a thread of gas pedal of the lever of the walk of a valve of butterfly (to see the Head of the system of provision of Power and launch).
6. Withdraw hoses of a way that cools of the case of regulator. In B18B1 and motors B18C1 also desconectam hoses cool of the valve of the stabilization of turns of wasting time (IAC).
7. The heap pressure in a power supplies to the system and desconecta of the road of fuel of the line of offer and return of the fuel (to see the Head of the system of provision of Power and launch).

8. I work of down below a reason compartment, withdraw the support of the triangular form of meeting that supports the oil pipeline of entry (companion sees an illustration).

9. Desconecte of the oil pipeline of entry perepuskny a hose of system of cooling (of a belt that distributes the gas) (companion sees an illustration).

10. Give nuts of fixation (to see the prior illustration) and withdraws the oil pipeline of entry of the motor.

11. If the oil pipeline is equipped from the removable air camera (motors of B18C1), to the will it is possible to give nuts of fixation and to separate the camera of the oil pipeline (companion to see an illustration). Withdraw the placing, the camera perepuskny of the soaked air (IAB), then the second placing.

Installation

 ORDER OF REALIZATION

1. Rub with the solvent of a nut of the fixation of the oil pipeline of entry, then carefully dry them, whenever possible with the use of compressed air.
2. Appreciate planeness of the inter-connected surface of the oil pipeline through the instrument of measuring specially (the steel ruler put an edge) and the probe of the type of lezviyny.
3. Examine the oil pipeline in existence of slits and signs of the deformation. The incorrect oil pipeline is subject to an in favor point or substitution.
4. Check a condition of the fixation (the pins / hair clips of hair) of the oil pipeline. Substitute incorrect unities.
5. Scratch had been the aspects of the material of the old placing of the inter-connected surfaces of a head and the oil pipeline of entry, soon rub surfaces with the rags moistened in the acetone.

6. Having caught the new placing of fighter, install the oil pipeline at the regular place and fix it, having held tight to the hand all the nuts. Working in that order (companion seeing an illustration), hold tight the fixation with the necessary effort (to see Specifications).


7. The new installation is done as it must be, the return to an order to be demolished. In the conclusion they do not forget of filling the system of cooling (to see the Front Regular maintenance).