Honda Civic/Acura Integra

from 1994 launch

Repair and operation of the car



Honda Tsivik
+ Cars of the mark of It Treats Full text and Honda Civic With care
+ Maintenance education
+ Regular maintenance
- Motor
   + Repair of the motor without extraction of the car - the Civic model
   + Repair of the motor without extraction of the car - the Full text model
   - General and repairs of capital of the motor
      General information
      Check of pressure of oil
      Check of pressure of compression in cylinders
      Diagnostic of a condition of the motor with use of the measure of vacuum
      Removal of the car of the unity of power - preparation and measured by precaution
      Removal and installation of the motor
      Alternative versions of schemes of repair of recuperation of the motor
      Order of desmontagem of the motor for preparation he to capital repairs
      Desmontagem of a head of cylinders
      To clean and check of a condition of a head of cylinders
      Valves service
      Meeting of a head of cylinders
      Removal of conrod and piston meetings
      Removal of an end of inclination
      Cleaning of the block of the motor
      Check of a condition of the block of the motor
      Honingovaniye of mirrors of cylinders
      Check of a condition of component ones of conrod and group of piston
      Check of a condition of an end of inclination
      Check of a state and selection of insertions of radical loads and conrod of an inclination end
      Order of meeting of motor
      Installation of rings of piston
      Installation of an end of inclination and check of slits of work of radical loads
      Substitution of a few back epiploon of an inclination end
      Installation of conrod and meetings of piston and check of size of slits of work in loads conrod of an inclination end
      Broken of proof and running in of the motor after capital repairs
+ Cooling of system and heating
+ System of provision of power and launch
+ Electric motor equipment
+ Systems of control of the motor
+ Box of dislocation of gear
+ Union and ends of power
+ Brakes system
+ Support of the triangular form of interruption and direction
+ Body
+ Electric side equipment


5dfc58ab

Installation of an end of inclination and check of slits of work of radical loads

 ORDER OF REALIZATION

1. The installation of an end of inclination is the first step in fact of the meeting of the motor. It is destined what in this stage the end of inclination and the block of the motor already clean properly, they happen and are restored.
2. Put motor from top to bottom.
3. Give pins of fixation and discover radical loads and / or meeting of his bridge.
4. They still did not do it, they take of the beds in the block and it covers old insertions of radical loads. Rub beds неворсящейся purely with rags – they will be perfectly pure.

Check of slits of work of radical loads

Try not to touch surfaces of new insertions barehanded always to avoid the undesirable contact of loads with with the aspects of oil and chemically aggressive substances that are present at fingers.


 ORDER OF REALIZATION

1. Rub back of new insertions of radical loads and enclose equipped of a flute of oil (if this supplies with itself) the halves in the beds in the block. Enclose the remained halves of insertions in the corresponding loads coverings. Follow that the trace of this the insertions uvulae entered in reciprocal landing grooves in beds of the block and coverings. The oil openings in the block also have it correctly go with openings in insertions.

Do not do attempts of beginning when the hammer to beat a resistant insertion to the installation in the bed anyway. Wet with nothing loads in this stage!


2. The persistent insertions equipped (lavadores) of flanges have to establish in a bed of the room (inclusive of a belt of GRM drive) the radical load (companion sees an illustration).

3. Rub the surfaces of loads in the block and the radical necks of the end of inclination неворсящейся purely with rags.
4. Check that passability of openings of oil of an end, in case of the necessity they clean them. Any foreign particle that is contained in maslotoka consequently inevitably comes to loads.
5. Exactly put the end of inclination carefully rubbed in radical loads of the block.
6. Before finishing an end, it is necessary to check sizes slits of work in his radical loads.

7. Cut the tipsy plastic wire of measuring parts of play of Plastigage, the width of length of insertions is lightly shorter, and it puts itself in a part of a wire along each one of radical necks of an end, parallel to his axle (companion sees an illustration).

8. Rub surfaces of insertions in coverings and establish the last thing and / or the meeting of his bridge at the regular place. Try not to move the parts of the tipsy wire put along necks of end. Lightly of oil a woodcarving of fixing pins and they screw us, having registered coverings.

9th. In the order specified in an illustration companion on three stages there insist pins of the fixation of coverings and / or his bridge with the (Civic) necessary effort.

9b. In the order specified in an illustration companion on three stages there insist pins of the fixation of coverings and / or his bridge with the necessary effort (Full text).


Do not allow an end provorachivaniye in the course of the pressure of the fixation!


10. Result pins and carefully discover root and / or the meeting of his bridge. Post discovered like an agreement they in the motor. Try not to damage the calibrated wire it had been leveled out and not to become an end. If some coverings do not give in to the removal, exactly they explore it for the launch for the hammer with the gentle living creature.

11. Determine the size of slits of work of loads for the width of the threads it had been leveled out when they were measured in the scale applied in the packing of the play of Plastigage (companion seen an illustration). Compare when they resulted from measurements to Specifications demands.

12. If the size of a slit exceeds admissible limits, the insertions not of that so great standard were established possibly (to see the Check of a state and the selection of insertions of radical loads and conrod of an inclination end). Before looking for new insertions, one secures that below enclosed dirt or oil did not come. If the tipsy wire will be leveled out out from an end more than of other, it demonstrates the existence of conicity of a neck (to see the Check of a condition of an end of inclination).
13. Carefully withdraw the tipsy wire of necks, having scratched it had been all his any aspects I do not score too strongly (for example, the edge of an old credit card). Like last resource, it is possible to use the nail itself, the main thing what in a necks / insertions surface there is no left scratch and zadir.

Final installation of an end of inclination

If the motor is equipped of the bridge of coverings of radical loads (B18C1, B18C5, D16Y5, D16Y7 or D16Y8), in the beginning establish at place conrod and group of piston (to see the Installation of conrod and meetings of piston and check of the size of slits of work in loads conrod of an inclination end). Then bring all the pistons in provisions of VMT that did not prevent the installation of the axle.


 ORDER OF REALIZATION

1. Carefully take an end of inclination of the motor.
2. Rub the surfaces of loads in the block and exactly polish them with a fine layer of the lubricant of reason of meeting molibdensoderzhashchy. Do not forget of polishing the persistent surfaces of the fourth load also.

Try not to allow blows of the lubricant in insertions back!


3. Make sure of the incondicionalidade of the purity of necks of an end of inclination, soon polish (the same lubricant) the surfaces of pins to contact the epiploons and exactly put an end in the block.
4. Rub and polish surfaces of insertions in coverings.
5. Install in the motor of a covering of radical loads and / or the meeting of his bridge.
6. Pins of fixation of screw.
7. In the necessary order, hold tight pins of the fixation of coverings of all the loads with the necessary effort.
8. Several times become an end of inclination manually, checking the freedom of his rotation.
9. In the conclusion through the probe of the type of lezviyny or the DTI to measure it of instrument determines the size of a play of axial side of an end (to see the Removal of an end of inclination). If the persistent surfaces of an end will not be used and will not be damaged, and the loads are substituted in the new, the play of axial side must not exceed admissible limits.
10. Establish a few new back epiploon of an end of inclination (to see the Substitution of a few back epiploon of an inclination end).