|
Honda Civic/Acura Integrafrom 1994 launchRepair and operation of the car |
|
Honda Tsivik + Cars of the mark of It Treats Full text and Honda Civic With care + Maintenance education - Regular maintenance Time-table of regular maintenance Specifications General information on placing and agreements Check of levels of liquids (each one 400 km of a race or weekly) Check of a condition of tires and pressure of his evaluation (each one 400 km of a race or weekly) Check of level of liquid of the direction of power (each one 4.800 km of a race or time during three months) Check of the ATF at level (each one 4.800 km of a race or time during three months) Substitution of filter of oil of reason and filter of oil (each one 4.800 km of a race or time during three months) Check of a state and substitution of brushes from clothes to rub of fabric (each one 12.000 km of a race or time during 6 months) Check, service and load of the battery recarregável (each one 12.000 km of a race or time during 6 months) Check of a state, agreement of effort of a tension and substitution of driving of belts, (each one 12.000 km of a race or time during 6 months) Check of a state and substitution of the hoses located in a compartment of reason (each one 12.000 km of a race or times during 6 months) Check of a condition of component ones of the system of cooling (each one 12.000 km of a race or time during 6 months) Rotation of wheels (each one 12.000 km of a race or time during 6 months) Check of the system of brakes (each one 12.000 km of a race or time during 6 months) Check of a condition of belts of seat (each one 24.000 km of a race or time during 12 months) Check and adjust of slits of valves (each one 24.000 km of a race or time during 12 months) Substitution of the element of purifier of air of filtration (each one 24.000 km of a race or times during two years) The check of a condition of component ones of a power supplies to the system (each one 24.000 km of a race or time during 12 months) Check of level of the oil of gear box RKPP (each one 24.000 km of a race or time during 12 months) Inquiry of component ones of a support of the triangular form of interruption and directing walk, check of a condition of protective coverings of ends of power Check of a condition of component ones of system of production of the carried out gases (each one 9.600 km of a race or times during 6 months) Check of a state and substitution of captures of spark Check of a state and substitution of VV of wires of candle, a covering and the corridor of the distributor (each one 48.000 km of a race or time during 24 months) Check and substitution of the valve of system of the ventilation made work of a case (PCV) (each one 48.000 km of a race or times during 24 months) Substitution of the filter of fuel (each one 48.000 km of a race or time during 24 months) Check and adjust of turns of wasting time (each one 48.000 km of a race or time during 24 months) Service of the system of cooling (depleção, washing and stuffing) (each one 48.000 km of a race or time during 24 months) Substitution of fluid of brake (each one 48.000 km of a race or time during 24 months) Substitution of liquid of automatic exchange (em/CVT) (each one 48.000 km of a race or time during 24 months) Substitution of the oil of gear box RKPP (each one 48.000 km of a race or time during 24 months) Unloading of the balcony of indicative of intervals of service + Motor + Cooling of system and heating + System of provision of power and launch + Electric motor equipment + Systems of control of the motor + Box of dislocation of gear + Union and ends of power + Brakes system + Support of the triangular form of interruption and direction + Body + Electric side equipment |
Check, service and load of the battery recarregável (each one 12.000 km of a race or time during 6 months)
Service Instruments and necessary materials in service of the battery recarregável Load
In the best way of the restoration of the level of a load of the battery that sat down up to such a point when it is incompetent to supply the launch of the motor, his slow load is. This way of collecting also is the best for batteries of the cars used in the way of short travels. The preservation of the level of a load of the battery is particularly important in the winter station when the most averse conditions of the point of view of the load of the accumulator are created during the complicated launches of the motor and the increased intensity of the consumers' functioning of the electric power. He is the best of all to use the device for the office junior they re-overdo for the small current (1÷2 A) sometimes called by also the decrease zaryazhatel). Such porters provide the best way of the load of battery of the least load of the last one. Since more bystry re-overdo of the battery it is possible to use the provision of power of the biggest current, remembers nevertheless that the very admissible force of collecting the current must not exceed 1/10 of the size of capacity of battery (his sentry of ampere of the characteristic). In the moment of the forced load, according to some users whom they allow to restore level of load during two hours, the load of the battery is so high that quite very often there is his irrevocable exit out of the operation, – they try he avoids what about way of recarregue - him resorting only in the extraordinary emergence. The middle duration of the period of the battery which snake has to be specified in the education annexed in a play to a porter. Normally it does of 12 for 16 hours. Discover mouths of all the cans of the battery (if you arrange if they supply) and an opening zakuporta pure rags to avoid the inclination of eletrólito. Desconecte a negative wire of the battery and, observing the polarity, join clips of hints of wires of the porter to taken of battery (I make positive – to positive, negative – to the negation). The porter lights in the net. If the device is equipped of the selecting key, it is secured what the last thing establishes in the situation of the 12th century. When it uses the provision of power with the load of more than two current amperes regularly it checks the battery, looking that it was no his overheating it. During the slow load after the initial control of two hours it is possible to leave the battery certainly to be loaded without supervision in the whole night. If the banks of the loaded battery are provided with gooey mouths with removable coverings, try to check of hour in hour inside several first hours of collecting the specific weight of the eletrólito. Many producers specially with this finality launch quite cheap devices called for areometers what can be bought practically in any shop of motor accessories. When it uses the areometer it follows the educations of manufacturers annexed to him. Continue the battery that it collects until during the last modification of measurements of two hours of the density of the eletrólito in the condition of his free "boiling" (puzyreniye) in banks it does not stop. Remember that in the useful battery the difference between the specific weight of the eletrólito in all the banks will be very small. Some batteries are put in the welded case and are equipped of the built areometer that there allows to determine visually the level of load of the battery coloring from a place to colors in a port of observation of the case. The usual brilliant coloration of a place to colors testifies at the high level of a load of the battery. The dark color of a place says that the still precise battery of re-overdoing. In batteries with the case held tight without the built areometer (indicative of level of load) the check of the level of a load can be executed by the connection to taken of battery of voltômetro. The tension of production of the completely loaded battery will do more low than 12,6 In the ambassador of the removal of a superficial load. |
|